VCA2619EVM

Mfr. #: VCA2619EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR VCA2619
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: VCA2619EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2619EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 20MHz The 300 V/μs. Current-Output-Channel is 40mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2619 Board type: Fully Populated. The product has 2 - Dual channel per IC.

VCA2619EVM Image

VCA2619EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2619EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 20MHz
  • Slew-Rate 300 V/μs
  • Current-Output-Channel 40mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2619
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -

VCA2619EVM

VCA2619EVM Specifications

VCA2619EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 85°C.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Differential.

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 4.75 V ~ 5.25 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 20MHz

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 300 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 40mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Variable Gain.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed VCA2619

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 2 - Dual

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ १५३.७५
US$ १५३.७५
10
US$ १४६.०६
US$ १ ४६०.६२
100
US$ १३८.३८
US$ १३ ८३७.५०
500
US$ १३०.६९
US$ ६५ ३४३.७५
1000
US$ १२३.००
US$ १२३ ०००.००
Top