UCD9081EVM

Mfr. #: UCD9081EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR UCD9081
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: UCD9081EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCD9081EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Supervisory Circuits The Power Management, Power Supply Supervisor/Tracker/Sequencer is the Main-Purpose. Primary-Attributes: 8 Channel Power Supply Sequencer IC package type: UCD9081 Output voltage: 2.6 V This tool is designed for the UCD9081. Our product measures 134.6 mm x 106.7 mm in dimensions for compact and convenient use. Input Voltage Range: 1.4 V to 2.4 V

UCD9081EVM Image

UCD9081EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCD9081EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Supervisory Circuits
  • Main-Purpose Power Management, Power Supply Supervisor/Tracker/Sequencer
  • Primary-Attributes 8 Channel Power Supply Sequencer
  • Embedded No
  • Utilized-IC-Part UCD9081
  • Output-Voltage 2.6 V
  • Tool-Is-For-Evaluation-Of UCD9081
  • Dimensions 134.6 mm x 106.7 mm
  • Input-Voltage 1.4 V to 2.4 V

UCD9081EVM

UCD9081EVM Specifications

UCD9081EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Supervisory Circuits

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Power Supply Supervisor/Tracker/Sequencer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 8 Channel Power Supply Sequencer

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is UCD9081.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 2.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is UCD9081.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 134.6 mm x 106.7 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 1.4 V to 2.4 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ २२३.५०
US$ २२३.५०
10
US$ २१२.३२
US$ २ १२३.२५
100
US$ २०१.१५
US$ २० ११५.००
500
US$ १८९.९८
US$ ९४ ९८७.५०
1000
US$ १७८.८०
US$ १७८ ८००.००
Top