UCC28070EVM

Mfr. #: UCC28070EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR UCC28070
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: UCC28070EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC28070EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Factor Correction Bulk is the packaging method for this product The Power Management, Power Factor Correction is the Main-Purpose. Primary-Attributes: 300W, 390V, 770mA Output, 85~265VAC Input IC package type: UCC28070 Output voltage: 390 V This product is an UCC28070 - Power Management,Power Factor Correction Evaluation Board. This tool is designed for the UCC28070. Input Voltage Range: 85 VAC to 265 VAC

UCC28070EVM Image

UCC28070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28070EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Factor Correction
  • Packaging Bulk
  • Main-Purpose Power Management, Power Factor Correction
  • Primary-Attributes 300W, 390V, 770mA Output, 85~265VAC Input
  • Embedded No
  • Utilized-IC-Part UCC28070
  • Output-Voltage 390 V
  • Description-Function UCC28070 - Power Management,Power Factor Correction Evaluation Board
  • Tool-Is-For-Evaluation-Of UCC28070
  • Input-Voltage 85 VAC to 265 VAC

UCC28070EVM

UCC28070EVM Specifications

UCC28070EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Factor Correction.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Power Factor Correction

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 300W, 390V, 770mA Output, 85~265VAC Input.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is UCC28070.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 390 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is UCC28070 - Power Management,Power Factor Correction Evaluation Board.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is UCC28070.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 85 VAC to 265 VAC.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ १४८.५०
US$ १४८.५०
10
US$ १४१.०८
US$ १ ४१०.७५
100
US$ १३३.६५
US$ १३ ३६५.००
500
US$ १२६.२२
US$ ६३ ११२.५०
1000
US$ ११८.८०
US$ ११८ ८००.००
Top