TXB0302EVM

Mfr. #: TXB0302EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR TXB0302
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TXB0302EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TXB0302EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers The Interface, Logic-Level Translator is the Main-Purpose. Primary-Attributes: 2 Bit, Bi-Directional IC package type: TXB0302 This tool is designed for the TXB0302. Input Voltage Range: 0.9 V to 3.6 V

TXB0302EVM Image

TXB0302EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TXB0302EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Gate Drivers
  • Main-Purpose Interface, Logic-Level Translator
  • Primary-Attributes 2 Bit, Bi-Directional
  • Embedded No
  • Utilized-IC-Part TXB0302
  • Tool-Is-For-Evaluation-Of TXB0302
  • Input-Voltage 0.9 V to 3.6 V

TXB0302EVM

TXB0302EVM Specifications

TXB0302EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Gate Drivers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Logic-Level Translator

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 2 Bit, Bi-Directional.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TXB0302

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TXB0302.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 0.9 V to 3.6 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ३१.०४
US$ ३१.०४
10
US$ २९.४८
US$ २९४.८३
100
US$ २७.९३
US$ २ ७९३.१५
500
US$ २६.३८
US$ १३ १८९.९०
1000
US$ २४.८३
US$ २४ ८२८.००
Top