TSW2170EVM

Mfr. #: TSW2170EVM
निर्माता: Texas Instruments
विवरण: EVALUATION BOARD FOR TSW2170
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TSW2170EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW2170EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: - This product operates at a 5 V supply voltage for reliable performance. This product is an Signal generator evaluation module for Texas Instruments ADCs. This tool is designed for the -.

TSW2170EVM Image

TSW2170EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW2170EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part -
  • Operating-Supply-Voltage 5 V
  • Description-Function Signal generator evaluation module for Texas Instruments ADCs
  • Tool-Is-For-Evaluation-Of -

TSW2170EVM

TSW2170EVM Specifications

TSW2170EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Generator.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is -.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Signal generator evaluation module for Texas Instruments ADCs

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is -.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ १७२.५२
US$ १७२.५२
10
US$ १६३.८९
US$ १ ६३८.८९
100
US$ १५५.२६
US$ १५ ५२६.३५
500
US$ १४६.६४
US$ ७३ ३१८.९०
1000
US$ १३८.०१
US$ १३८ ०१२.००
Top