TRF37B73EVM

Mfr. #: TRF37B73EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR TRF37A73
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TRF37B73EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37B73EVM Overview

Compatible with TRF37B73. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Amplifier This product's 1MHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37B73.

TRF37B73EVM Image

TRF37B73EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37B73EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37B73
  • Series -
  • Product Evaluation Modules
  • Type Amplifier
  • Frequency 1MHz ~ 6GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37B73

TRF37B73EVM

TRF37B73EVM Specifications

TRF37B73EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF37B73.

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Amplifier.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 1MHz ~ 6GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF37B73

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ५६.७४
US$ ५६.७४
10
US$ ५३.९१
US$ ५३९.०८
100
US$ ५१.०७
US$ ५ १०७.०५
500
US$ ४८.२३
US$ २४ ११६.६५
1000
US$ ४५.४०
US$ ४५ ३९६.००
Top