TPS6735EVM

Mfr. #: TPS6735EVM
निर्माता: Texas Instruments
विवरण: EVAL MOD FOR TPS6735
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS6735EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS6735EVM Overview

Product belongs to the - series. The DC/DC, Negative Inverter is the Main-Purpose. 4 V ~ 6.2 V voltage input This product features 'Frequency-Switching' at 160Hz for optimal performance. Output voltage: -5V Inverting regulator topology - Included item: Board. IC package type: TPS6735 Board type: Fully Populated. The product has 1, Non-Isolated outputs.

TPS6735EVM Image

TPS6735EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS6735EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose DC/DC, Negative Inverter
  • Voltage-Input 4 V ~ 6.2 V
  • Frequency-Switching 160Hz
  • Current-Output 200mA
  • Voltage-Output -5V
  • Regulator-Topology Inverting
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS6735
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated

TPS6735EVM

TPS6735EVM Specifications

TPS6735EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Negative Inverter.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 4 V ~ 6.2 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 160Hz.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -5V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Inverting

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS6735.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ९६.७०
US$ ९६.७०
10
US$ ९१.८७
US$ ९१८.७०
100
US$ ८७.०३
US$ ८ ७०३.४५
500
US$ ८२.२०
US$ ४१ ०९९.६५
1000
US$ ७७.३६
US$ ७७ ३६४.००
Top