| Mfr. #: | TPS2390EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | EVAL MOD FOR TPS2390 |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TPS2390EVM डाटा पाना |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2390 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2390. Our product measures 81.9 mm x 56.8 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2390EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: At what frequency does the Type?
Q: The product Type is Hot Swap Voltage Controllers.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Hot Swap Controller
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TPS2390
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 85 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TPS2390.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 81.9 mm x 56.8 mm.
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed - 48 V