TPL0501EVM

Mfr. #: TPL0501EVM
निर्माता: Texas Instruments
विवरण: LED Lighting Development Tools TPL0501 EVAL MOD
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPL0501EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL0501EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product This product is designed TPL0501 amplifier. The Digital Potentiometer is the Main-Purpose. Primary-Attributes: 1 Channel, 256 Position IC package type: TPL0501 This product operates at a 5.5 V supply voltage for reliable performance.

TPL0501EVM Image

TPL0501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL0501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • For-Use-With TPL0501
  • Main-Purpose Digital Potentiometer
  • Primary-Attributes 1 Channel, 256 Position
  • Embedded No
  • Utilized-IC-Part TPL0501
  • Operating-Supply-Voltage 5.5 V

TPL0501EVM

TPL0501EVM Specifications

TPL0501EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TPL0501

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Digital Potentiometer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 1 Channel, 256 Position

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPL0501

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ३०.००
US$ ३०.००
10
US$ २८.५०
US$ २८५.००
100
US$ २७.००
US$ २ ७००.००
500
US$ २५.५०
US$ १२ ७५०.००
1000
US$ २४.००
US$ २४ ०००.००
Top