| Mfr. #: | TMP709EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Sensor Development Tools Temperature Sensor Development Tools TMP709 Eval Mod |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TMP709EVM डाटा पाना |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP709 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP709.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP709EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Temperature Sensors.
A: Is the cutoff frequency of the product Sensitivity?
Q: Yes, the product's Sensitivity is indeed ±3°C
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed Analog
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Thermostat.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed 0°C ~ 125°C
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TMP709.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 2.7 V to 5.5 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TMP709.