| Mfr. #: | TMP708EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Sensor Development Tools Temperature Sensor Development Tools TMP708 Eval Mod |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TMP708EVM डाटा पाना |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP708 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP708.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP708EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is Temperature Sensors.
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±3°C.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed Analog
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Thermostat.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is 0°C ~ 125°C.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TMP708.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 125 C.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP708