| Mfr. #: | TMP122EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Sensor Development Tools Temperature Sensor Development Tools TMP122 Eval Mod |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TMP122EVM डाटा पाना |


Product belongs to the - series. Sensitivity: ±0.5°C Interface: SPI Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 150°C Included item: Board. IC package type: TMP122

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP122EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±0.5°C.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed SPI
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Temperature.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -55°C ~ 150°C
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TMP122.