| Mfr. #: | TMP108EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Sensor Development Tools Temperature Sensor Development Tools TMP108 EVAL MOD |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TMP108EVM डाटा पाना |


Product belongs to the - series. This product is categorized as Evaluation Boards Sensitivity: ±1°C Interface: I2C, SMBus, USB Voltage Supply Range: 1.4 V ~ 3.6 V Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP108 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP108. I2C USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±1°C.
A: What is the Interface of the product?
Q: The Interface of the product is I2C, SMBus, USB.
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 1.4 V ~ 3.6 V.
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -40°C ~ 125°C
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TMP108.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 1.8 V 3.3 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP108
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is I2C USB.