TMP104EVM

Mfr. #: TMP104EVM
निर्माता: Texas Instruments
विवरण: Sensor Development Tools Temperature Sensor Development Tools TMP104 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TMP104EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP104EVM Overview

Product belongs to the SMAARTWIRE series. Sensitivity: ±3°C Interface: - Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP104

TMP104EVM Image

TMP104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series SMAARTWIRE
  • Sensitivity ±3°C
  • Interface -
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part TMP104

TMP104EVM

TMP104EVM Specifications

TMP104EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is SMAARTWIRE.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±3°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is -.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cables.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TMP104.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ११२.५०
US$ ११२.५०
10
US$ १०६.८८
US$ १ ०६८.७५
100
US$ १०१.२५
US$ १० १२५.००
500
US$ ९५.६२
US$ ४७ ८१२.५०
1000
US$ ९०.००
US$ ९० ०००.००
Top