| Mfr. #: | TMP102EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Sensor Development Tools Temperature Sensor Development Tools TMP102 EVAL MOD |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TMP102EVM डाटा पाना |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±3°C Interface: Serial Voltage Supply Range: 3.3V Temperature Sensing range of -40°C ~ 125°C Included item: Board, Cables. IC package type: TMP102 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.4 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TMP102. I2C USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP102EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Temperature Sensors
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±3°C.
A: What is the Interface of the product?
Q: The Interface of the product is Serial.
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 3.3V.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Temperature.
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -40°C ~ 125°C.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board, Cables.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TMP102.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 125 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.4 V to 3.6 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP102
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is I2C USB.