Product belongs to the - series. The Video, Amplifier, Triple is the Main-Purpose. Primary-Attributes: - IC package type: THS7319 This product operates at a 2.6 V to 5 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the THS7319. 3.4 mA is 92 nA.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS7319EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Video, Amplifier, Triple.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed -
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed THS7319
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 2.6 V to 5 V.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is Evaluation Module.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is THS7319.
A: What is the Operating-Supply-Current of the product?
Q: The Operating-Supply-Current of the product is 3.4 mA.