Product belongs to the PurePath HD series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 25 V ~ 50 V Maximum Output Power of 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS5630 Board type: Fully Populated. This product operates at a 25 V to 50 V supply voltage for reliable performance. This tool is designed for the TAS5630PHD. 16 A is 92 nA. Our product measures 140 mm x 90 mm x 55 mm in dimensions for compact and convenient use.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5630PHD2EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is PurePath HD.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Audio Amplifiers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Output-Type of the product?
Q: The Output-Type of the product is 2-Channel (Stereo).
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 25 V ~ 50 V.
A: What is the Max-Output-Power-x-Channels-Load of the product?
Q: The Max-Output-Power-x-Channels-Load of the product is 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Class D.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TAS5630
A: Is the cutoff frequency of the product Board-Type?
Q: Yes, the product's Board-Type is indeed Fully Populated
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 25 V to 50 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TAS5630PHD
A: At what frequency does the Operating-Supply-Current?
Q: The product Operating-Supply-Current is 16 A.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 140 mm x 90 mm x 55 mm.