RF430F5978EVM

Mfr. #: RF430F5978EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR RF430F5987
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: RF430F5978EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
RF430F5978EVM Overview

Compatible with RF430F5978. Product belongs to the RF430F5978 series. This product is categorized as Evaluation Kits Type: Transceiver Bulk is the packaging method for this product This product is designed TPS62163 TPS62082 amplifier. This product's 300MHz ~ 950MHz range is 0Hz to 2.2GHz. Included item: 3 Boards. This product operates at a 2.1 V to 3 V supply voltage for reliable performance. This product is an Sub 1 GHz transceiver LF wake receiver/transponder SoC. This tool is designed for the RF430F5978. USB interface type

RF430F5978EVM Image

RF430F5978EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

RF430F5978EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products RF430F5978
  • Series RF430F5978
  • Product Evaluation Kits
  • Type Transceiver
  • Packaging Bulk
  • For-Use-With TPS62163 TPS62082
  • Frequency 300MHz ~ 950MHz
  • Supplied-Contents 3 Boards
  • Operating-Supply-Voltage 2.1 V to 3 V
  • Description-Function Sub 1 GHz transceiver LF wake receiver/transponder SoC
  • Tool-Is-For-Evaluation-Of RF430F5978
  • Interface-Type USB

RF430F5978EVM

RF430F5978EVM Specifications

RF430F5978EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is RF430F5978.

  • A: At what frequency does the Series?

    Q: The product Series is RF430F5978.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is Transceiver.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TPS62163 TPS62082

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 300MHz ~ 950MHz

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 3 Boards.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.1 V to 3 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Sub 1 GHz transceiver LF wake receiver/transponder SoC.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is RF430F5978.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ४३५.००
US$ ४३५.००
10
US$ ४१३.२५
US$ ४ १३२.५०
100
US$ ३९१.५०
US$ ३९ १५०.००
500
US$ ३६९.७५
US$ १८४ ८७५.००
1000
US$ ३४८.००
US$ ३४८ ०००.००
Top