REG710EVM-5

Mfr. #: REG710EVM-5
निर्माता: Texas Instruments
विवरण: EVAL MOD FOR REG710-XX
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: REG710EVM-5 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
REG710EVM-5 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Charge Pumps Bulk is the packaging method for this product The DC/DC, Step Up or Down is the Main-Purpose. 2.7 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 1MHz for optimal performance. Output voltage: 5V Buck-Boost regulator topology - Included item: Board. IC package type: REG710 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 5 V This tool is designed for the REG710. Our product measures 50.8 mm x 50.8 mm in dimensions for compact and convenient use. Input Voltage Range: 2.7 V to 5.5 V

REG710EVM-5 Image

REG710EVM-5

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

REG710EVM-5 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Charge Pumps
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 2.7 V ~ 5.5 V
  • Frequency-Switching 1MHz
  • Current-Output 30mA
  • Voltage-Output 5V
  • Regulator-Topology Buck-Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part REG710
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 5 V
  • Tool-Is-For-Evaluation-Of REG710
  • Dimensions 50.8 mm x 50.8 mm
  • Input-Voltage 2.7 V to 5.5 V

REG710EVM-5

REG710EVM-5 Specifications

REG710EVM-5 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Charge Pumps.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed DC/DC, Step Up or Down

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 2.7 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 1MHz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 5V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck-Boost.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is REG710.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Non-Isolated.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is REG710.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 50.8 mm x 50.8 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 2.7 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ५६.७४
US$ ५६.७४
10
US$ ५३.९१
US$ ५३९.०८
100
US$ ५१.०७
US$ ५ १०७.०५
500
US$ ४८.२३
US$ २४ ११६.६५
1000
US$ ४५.४०
US$ ४५ ३९६.००
Top