LMT88-9EVM

Mfr. #: LMT88-9EVM
निर्माता: Texas Instruments
विवरण: Sensor Development Tools Temperature Sensor Development Tools LMT88-9EVM Temp Sensor EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: LMT88-9EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT88-9EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1.5°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 130°C Included item: Board. IC package type: LMT88, LMT89 Maximum operating temperature of + 130 C Minimum operating temperature: - 55 C This product operates at a 2.4 V to 5.5 V supply voltage for reliable performance. This tool is designed for the LMT88 LMT89.

LMT88-9EVM Image

LMT88-9EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT88-9EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1.5°C
  • Interface Analog
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 130°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LMT88, LMT89
  • Maximum-Operating-Temperature + 130 C
  • Minimum-Operating-Temperature - 55 C
  • Operating-Supply-Voltage 2.4 V to 5.5 V
  • Tool-Is-For-Evaluation-Of LMT88 LMT89

LMT88-9EVM

LMT88-9EVM Specifications

LMT88-9EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±1.5°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is Analog.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 2.7 V ~ 5.5 V

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -55°C ~ 130°C

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LMT88, LMT89.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 130 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 55 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.4 V to 5.5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LMT88 LMT89

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ४३.५०
US$ ४३.५०
10
US$ ४१.३२
US$ ४१३.२५
100
US$ ३९.१५
US$ ३ ९१५.००
500
US$ ३६.९८
US$ १८ ४८७.५०
1000
US$ ३४.८०
US$ ३४ ८००.००
Top