DRV8848EVM

Mfr. #: DRV8848EVM
निर्माता: Texas Instruments
विवरण: EVAL BOARD FOR DRV8848
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DRV8848EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8848EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8848 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge) Driver IC package type: DRV8848 This tool is designed for the DRV8848. USB interface type

DRV8848EVM Image

DRV8848EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8848EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8848
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Dual Full-Bridge (H-Bridge) Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8848
  • Tool-Is-For-Evaluation-Of DRV8848
  • Interface-Type USB

DRV8848EVM

DRV8848EVM Specifications

DRV8848EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8848.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Dual Full-Bridge (H-Bridge) Driver

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8848.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8848

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ७३.५०
US$ ७३.५०
10
US$ ६९.८२
US$ ६९८.२५
100
US$ ६६.१५
US$ ६ ६१५.००
500
US$ ६२.४८
US$ ३१ २३७.५०
1000
US$ ५८.८०
US$ ५८ ८००.००
Top