DRV8839EVM

Mfr. #: DRV8839EVM
निर्माता: Texas Instruments
विवरण: EVAL BOARD FOR DRV8839
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DRV8839EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8839EVM Overview

Product belongs to the DRV8839 series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product This product is designed DRV8839 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brush DC Motors IC package type: DRV8839 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product is an Complete solution for evaluating the low voltage brushed DC motor driver. This tool is designed for the DRV8839. USB interface type Input Voltage Range: 3.3 V Output current: 1.8 A

DRV8839EVM Image

DRV8839EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8839EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8839
  • Product Evaluation Modules
  • Type Gate Drivers
  • Packaging Bulk
  • For-Use-With DRV8839
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Brush DC Motors
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8839
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function Complete solution for evaluating the low voltage brushed DC motor driver
  • Tool-Is-For-Evaluation-Of DRV8839
  • Interface-Type USB
  • Input-Voltage 3.3 V
  • Output-Current 1.8 A

DRV8839EVM

DRV8839EVM Specifications

DRV8839EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DRV8839

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DRV8839.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Brush DC Motors.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8839

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Complete solution for evaluating the low voltage brushed DC motor driver

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8839.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 1.8 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ३७.५०
US$ ३७.५०
10
US$ ३५.६२
US$ ३५६.२५
100
US$ ३३.७५
US$ ३ ३७५.००
500
US$ ३१.८८
US$ १५ ९३७.५०
1000
US$ ३०.००
US$ ३० ०००.००
Top