DRV3204EVM

Mfr. #: DRV3204EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR DRV3204
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DRV3204EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3204EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers This product is designed DRV3204-Q1 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3-Ph Brushless DC (BLDC) Motors IC package type: DRV3204 This product is an An application board to evaluate the DRV3204-Q1. This tool is designed for the DRV3204-Q1. SPI interface type Input Voltage Range: 12 V Output current: 10 A

DRV3204EVM Image

DRV3204EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3204EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • For-Use-With DRV3204-Q1
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3-Ph Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV3204
  • Description-Function An application board to evaluate the DRV3204-Q1
  • Tool-Is-For-Evaluation-Of DRV3204-Q1
  • Interface-Type SPI
  • Input-Voltage 12 V
  • Output-Current 10 A

DRV3204EVM

DRV3204EVM Specifications

DRV3204EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed DRV3204-Q1

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3-Ph Brushless DC (BLDC) Motors.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV3204

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed An application board to evaluate the DRV3204-Q1

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV3204-Q1.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 12 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 10 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ १.००
US$ १.००
10
US$ ९५७.४७
US$ ९ ५७४.७२
100
US$ ९०७.०८
US$ ९० ७०७.८५
500
US$ ८५६.६९
US$ ४२८ ३४२.६५
1000
US$ ८०६.२९
US$ ८०६ २९२.००
Top