DAC8574EVM

Mfr. #: DAC8574EVM
निर्माता: Texas Instruments
विवरण: EVALUATION MODULE FOR DAC8574
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DAC8574EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8574EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8574. I2C interface type

DAC8574EVM Image

DAC8574EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8574EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8574
  • Interface-Type I2C

DAC8574EVM

DAC8574EVM Specifications

DAC8574EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8574

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ५६.७४
US$ ५६.७४
10
US$ ५३.९१
US$ ५३९.०८
100
US$ ५१.०७
US$ ५ १०७.०५
500
US$ ४८.२३
US$ २४ ११६.६५
1000
US$ ४५.४०
US$ ४५ ३९६.००
Top