CDCLVP1212EVM

Mfr. #: CDCLVP1212EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR CDCLVP1212
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: CDCLVP1212EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1212EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVP1212 Minimum operating temperature: - 40 C This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP1212.

CDCLVP1212EVM Image

CDCLVP1212EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1212EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVP1212
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP1212

CDCLVP1212EVM

CDCLVP1212EVM Specifications

CDCLVP1212EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Clock Buffers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 200 MHz 2 GHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDCLVP1212

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.375 V to 3.6 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCLVP1212.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ २८.६४
US$ २८.६४
10
US$ २७.२०
US$ २७२.०३
100
US$ २५.७७
US$ २ ५७७.१५
500
US$ २४.३४
US$ १२ १६९.९०
1000
US$ २२.९१
US$ २२ ९०८.००
Top