| Mfr. #: | BQ76930EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | EVAL MODULE FOR BQ76930 |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | BQ76930EVM डाटा पाना |


Product belongs to the BQ76930 series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed EV2300 EV2400 amplifier. The Power Management, Battery Monitor is the Main-Purpose. Primary-Attributes: - IC package type: BQ76930 Maximum operating temperature of + 30 C Minimum operating temperature: + 20 C Output voltage: 2.5 V This tool is designed for the BQ76930. USB interface type Input Voltage Range: 26 V to 44 V Output current: 15 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76930EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is BQ76930.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: What is the For-Use-With of the product?
Q: The For-Use-With of the product is EV2300 EV2400.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Power Management, Battery Monitor.
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is BQ76930.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 30 C
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is + 20 C.
A: At what frequency does the Output-Voltage?
Q: The product Output-Voltage is 2.5 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ76930
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is USB.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 26 V to 44 V.
A: Is the cutoff frequency of the product Output-Current?
Q: Yes, the product's Output-Current is indeed 15 A