ADS8331EVM

Mfr. #: ADS8331EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS8331
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS8331EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8331EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 500k. Data-Interface: DSP, Serial, SPI 16 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS8331 This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the ADS8331. Unipolar interface type

ADS8331EVM Image

ADS8331EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8331EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 500k
  • Data-Interface DSP, Serial, SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8331
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of ADS8331
  • Interface-Type Unipolar

ADS8331EVM

ADS8331EVM Specifications

ADS8331EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 500k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is DSP, Serial, SPI.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ VREF

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8331

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8331.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Unipolar.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ९४.५६
US$ ९४.५६
10
US$ ८९.८३
US$ ८९८.३२
100
US$ ८५.१०
US$ ८ ५१०.४०
500
US$ ८०.३८
US$ ४० १८८.००
1000
US$ ७५.६५
US$ ७५ ६४८.००
Top