ADS8317EVM-PDK

Mfr. #: ADS8317EVM-PDK
निर्माता: Texas Instruments
विवरण: KIT PERFORMANCE DEMO FOR ADS8317
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS8317EVM-PDK डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8317EVM-PDK Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 250k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: 2 Boards. IC package type: ADS8317 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8317. USB interface type

ADS8317EVM-PDK Image

ADS8317EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8317EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 250k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS8317
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8317
  • Interface-Type USB

ADS8317EVM-PDK

ADS8317EVM-PDK Specifications

ADS8317EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed microPOWER

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250k

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ 5 V

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8317.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS8317.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ १७२.५२
US$ १७२.५२
10
US$ १६३.८९
US$ १ ६३८.८९
100
US$ १५५.२६
US$ १५ ५२६.३५
500
US$ १४६.६४
US$ ७३ ३१८.९०
1000
US$ १३८.०१
US$ १३८ ०१२.००
Top