ADS7864M-EVM

Mfr. #: ADS7864M-EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS7864M
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS7864M-EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7864M-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 500k. Data-Interface: Parallel 12 bits 2 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS7864 This product operates at a 4.75 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7864.

ADS7864M-EVM Image

ADS7864M-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7864M-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 500k
  • Data-Interface Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7864
  • Power-Typ-Conditions 50mW @ 500kSPS
  • Operating-Supply-Voltage 4.75 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS7864

ADS7864M-EVM

ADS7864M-EVM Specifications

ADS7864M-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 500k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ 5 V

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7864.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 4.75 V to 5.25 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7864

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ १४९.२४
US$ १४९.२४
10
US$ १४१.७७
US$ १ ४१७.७३
100
US$ १३४.३१
US$ १३ ४३१.१५
500
US$ १२६.८५
US$ ६३ ४२४.९०
1000
US$ ११९.३९
US$ ११९ ३८८.००
Top