ADS58C48EVM

Mfr. #: ADS58C48EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS58C48
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS58C48EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS58C48EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 200M. Data-Interface: Serial, Parallel 11 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADS58C48 This product operates at a 2.1 V supply voltage for reliable performance. This tool is designed for the ADS58C48. CMOS LVDS interface type

ADS58C48EVM Image

ADS58C48EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS58C48EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 200M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 11
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS58C48
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2.1 V
  • Tool-Is-For-Evaluation-Of ADS58C48
  • Interface-Type CMOS LVDS

ADS58C48EVM

ADS58C48EVM Specifications

ADS58C48EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 200M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 11.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 4.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS58C48

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.1 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS58C48.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed CMOS LVDS

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ३३६.०२
US$ ३३६.०२
10
US$ ३१९.२१
US$ ३ १९२.१४
100
US$ ३०२.४१
US$ ३० २४१.३५
500
US$ २८५.६१
US$ १४२ ८०६.४०
1000
US$ २६८.८१
US$ २६८ ८१२.००
Top