ADS54T02EVM

Mfr. #: ADS54T02EVM
निर्माता: Texas Instruments
विवरण: EVALUATION MODULE FOR ADS5402
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS54T02EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54T02EVM Overview

Product belongs to the - series. This product's 750M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS54T02

ADS54T02EVM Image

ADS54T02EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54T02EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 750M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS54T02
  • Power-Typ-Conditions 2.1W @ 750MSPS

ADS54T02EVM

ADS54T02EVM Specifications

ADS54T02EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 750M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 1 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS54T02.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ५७७.८०
US$ ५७७.८०
10
US$ ५४८.९१
US$ ५ ४८९.१०
100
US$ ५२०.०२
US$ ५२ ००२.००
500
US$ ४९१.१३
US$ २४५ ५६५.००
1000
US$ ४६२.२४
US$ ४६२ २४०.००
Top