ADS5287EVM

Mfr. #: ADS5287EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS5287
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS5287EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5287EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial 10 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS5287 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5287. SMA interface type

ADS5287EVM Image

ADS5287EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5287EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial
  • Number-of-Bits 10
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5287
  • Power-Typ-Conditions 74mW @ 65MSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5287
  • Interface-Type SMA

ADS5287EVM

ADS5287EVM Specifications

ADS5287EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 10

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5287.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V to 5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5287.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ४४८.५०
US$ ४४८.५०
10
US$ ४२६.०८
US$ ४ २६०.७५
100
US$ ४०३.६५
US$ ४० ३६५.००
500
US$ ३८१.२२
US$ १९० ६१२.५०
1000
US$ ३५८.८०
US$ ३५८ ८००.००
Top