ADS5232EVM

Mfr. #: ADS5232EVM
निर्माता: Texas Instruments
विवरण: MODULE EVAL FOR ADS5232
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS5232EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5232EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial 12 bits 2 units Input range: 1.5 ~ 2 Vpp Included item: Board. IC package type: ADS5232 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5232.

ADS5232EVM Image

ADS5232EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5232EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1.5 ~ 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5232
  • Power-Typ-Conditions 371mW @ 65MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5232

ADS5232EVM

ADS5232EVM Specifications

ADS5232EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 65M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1.5 ~ 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5232.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS5232

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ २३०.४३
US$ २३०.४३
10
US$ २१८.९१
US$ २ १८९.०८
100
US$ २०७.३९
US$ २० ७३८.७०
500
US$ १९५.८७
US$ ९७ ९३२.७५
1000
US$ १८४.३४
US$ १८४ ३४४.००
Top