ADS5120EVM

Mfr. #: ADS5120EVM
निर्माता: Texas Instruments
विवरण: MODULE EVAL FOR ADS5120
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS5120EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5120EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 40M. Data-Interface: Parallel 10 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5120 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the ADS5120. SMA interface type

ADS5120EVM Image

ADS5120EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5120EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 40M
  • Data-Interface Parallel
  • Number-of-Bits 10
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5120
  • Power-Typ-Conditions 794mW @ 40MSPS
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of ADS5120
  • Interface-Type SMA

ADS5120EVM

ADS5120EVM Specifications

ADS5120EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 40M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Parallel

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 10.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5120.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5120.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ५६०.७९
US$ ५६०.७९
10
US$ ५३२.७५
US$ ५ ३२७.५०
100
US$ ५०४.७१
US$ ५० ४७१.१०
500
US$ ४७६.६७
US$ २३८ ३३५.७५
1000
US$ ४४८.६३
US$ ४४८ ६३२.००
Top