ADS4246EVM

Mfr. #: ADS4246EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS4246
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS4246EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4246EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4246 This tool is designed for the ADS4246. USB interface type

ADS4246EVM Image

ADS4246EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4246EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 160M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4246
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4246
  • Interface-Type USB

ADS4246EVM

ADS4246EVM Specifications

ADS4246EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 160M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is CMOS, LVDS, Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4246.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS4246.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ४४८.५०
US$ ४४८.५०
10
US$ ४२६.०८
US$ ४ २६०.७५
100
US$ ४०३.६५
US$ ४० ३६५.००
500
US$ ३८१.२२
US$ १९० ६१२.५०
1000
US$ ३५८.८०
US$ ३५८ ८००.००
Top