ADS4245EVM

Mfr. #: ADS4245EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS4245
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS4245EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4245EVM Overview

Product belongs to the - series. This product's 125M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4246

ADS4245EVM Image

ADS4245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4245EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 125M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4246
  • Power-Typ-Conditions -

ADS4245EVM

ADS4245EVM Specifications

ADS4245EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 125M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS4246

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ३४६.२०
US$ ३४६.२०
10
US$ ३२८.८९
US$ ३ २८८.९०
100
US$ ३११.५८
US$ ३१ १५८.००
500
US$ २९४.२७
US$ १४७ १३५.००
1000
US$ २७६.९६
US$ २७६ ९६०.००
Top