ADS4142EVM

Mfr. #: ADS4142EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE FOR ADS4142
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS4142EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4142EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS4142 This tool is designed for the ADS4142. SPI interface type

ADS4142EVM Image

ADS4142EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4142EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4142
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4142
  • Interface-Type SPI

ADS4142EVM

ADS4142EVM Specifications

ADS4142EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 65M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4142.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS4142.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ५७.४६
US$ ५७.४६
10
US$ ५४.५९
US$ ५४५.९२
100
US$ ५१.७२
US$ ५ १७१.८५
500
US$ ४८.८५
US$ २४ ४२२.६५
1000
US$ ४५.९७
US$ ४५ ९७२.००
Top