ADC3441EVM

Mfr. #: ADC3441EVM
निर्माता: Texas Instruments
विवरण: EVAL MODULE ADC3441
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADC3441EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3441EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 25M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3441 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3441 14 bit 4 channel 25 Msps analog to digital converter. This tool is designed for the ADC3441. Serial LVDS interface type

ADC3441EVM Image

ADC3441EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3441EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 25M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3441
  • Power-Typ-Conditions 177mW @ 25MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3441 14 bit 4 channel 25 Msps analog to digital converter
  • Tool-Is-For-Evaluation-Of ADC3441
  • Interface-Type Serial LVDS

ADC3441EVM

ADC3441EVM Specifications

ADC3441EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 25M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 4.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADC3441

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed ADC3441 14 bit 4 channel 25 Msps analog to digital converter

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC3441

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Serial LVDS.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
1
US$ ४५४.५१
US$ ४५४.५१
10
US$ ४३१.७८
US$ ४ ३१७.८०
100
US$ ४०९.०६
US$ ४० ९०५.५१
500
US$ ३८६.३३
US$ १९३ १६४.९०
1000
US$ ३६३.६०
US$ ३६३ ६०४.६०
Top