TUSB7340EVM

Mfr. #: TUSB7340EVM
निर्माता: Texas Instruments
विवरण: Interface Development Tools 4-port SuperSpd USB xHCI PCIe Card Ref
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TUSB7340EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB7340EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Dimensions of 4.38 in x 2.57 in Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TUSB7340EVM Image

TUSB7340EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB7340EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: USB
  • Tool Is For Evaluation Of: TUSB7340
  • Description/Function: TUSB7340EVM board is a free-standing reference design for a four-port PCIebased SuperSpeed USB (USB 3.0) Extensible Host Controller (xHCI)
  • Dimensions: 4.38 in x 2.57 in
  • Series: TUSB7340
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TUSB7340EVM

TUSB7340EVM Specifications

TUSB7340EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is USB.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 4.38 in x 2.57 in.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top