TSC2007EVM-PDK

Mfr. #: TSC2007EVM-PDK
निर्माता: Texas Instruments
विवरण: Display Development Tools TSC2007EVM-PDK Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TSC2007EVM-PDK डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2007EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Kits 1.8 V, 3.3 V operating supply voltage range Interface Type: 4-Wire, USB Texas Instruments is a trusted brand for quality electronics Compatible with USB-MODEVM. Display Development Tools product type 1 of 100 Development Tools as subcategory

TSC2007EVM-PDK Image

TSC2007EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: E
  • Product: Evaluation Kits
  • Tool Is For Evaluation Of: TSC2007
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Interface Type: 4-Wire, USB
  • Series: TSC2007
  • Brand: Texas Instruments
  • For Use With: USB-MODEVM
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2007EVM-PDK

TSC2007EVM-PDK Specifications

TSC2007EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.8 V, 3.3 V.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed 4-Wire, USB

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is USB-MODEVM.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Display Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top