TS3A227E-EVM

Mfr. #: TS3A227E-EVM
निर्माता: Texas Instruments
विवरण: Switch IC Development Tools TS3A227E Evaluation Module
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TS3A227E-EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3A227E-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio Switches type. Texas Instruments is a trusted brand for quality electronics Switch IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.077907 oz of Unit Weight

TS3A227E-EVM Image

TS3A227E-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3A227E-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Audio Switches
  • Tool Is For Evaluation Of: TS3A227E
  • Series: TS3A227E
  • Brand: Texas Instruments
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.077907 oz

TS3A227E-EVM

TS3A227E-EVM Specifications

TS3A227E-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Switches.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Switch IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.077907 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top