TRF7960EVM

Mfr. #: TRF7960EVM
निर्माता: Texas Instruments
विवरण: RF Development Tools RFID READER
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TRF7960EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF7960EVM Overview

This product is manufactured by Texas Instruments. Development Kits Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF7960EVM Image

TRF7960EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF7960EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Development Kits
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF7960EVM

TRF7960EVM Specifications

TRF7960EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Development Kits

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RF Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top