TRF371109EVM

Mfr. #: TRF371109EVM
निर्माता: Texas Instruments
विवरण: RF Development Tools TRF371109 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TRF371109EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF371109EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Modulators / Demodulators type. Frequency range: 300 MHz to 1.7 GHz 5 V operating supply voltage range Dimensions of 333.2 mm x 345.9 mm x 28.6 mm Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF371109EVM Image

TRF371109EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF371109EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Modulators / Demodulators
  • Tool Is For Evaluation Of: TRF371109
  • Frequency: 300 MHz to 1.7 GHz
  • Operating Supply Voltage: 5 V
  • Description/Function: Used to test the performance of the TRF371135 direct quadrature demodulator device
  • Dimensions: 333.2 mm x 345.9 mm x 28.6 mm
  • Series: TRF371109
  • Brand: Texas Instruments
  • Interface Type: USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF371109EVM

TRF371109EVM Specifications

TRF371109EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Modulators / Demodulators.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 300 MHz to 1.7 GHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 333.2 mm x 345.9 mm x 28.6 mm

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top