TPS92010EVM-592

Mfr. #: TPS92010EVM-592
निर्माता: Texas Instruments
विवरण: LED Lighting Development Tools PS92010EVM-592
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS92010EVM-592 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS92010EVM-592 Overview

This product is manufactured by Texas Instruments. Evaluation Boards Compatible with TPS92010. 130 V operating supply voltage range Output current: 325 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

TPS92010EVM-592 Image

TPS92010EVM-592

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS92010EVM-592 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • For Use With: TPS92010
  • Operating Supply Voltage: 130 V
  • Series: TPS92010
  • Description/Function: TPS92010 evaluation module for 110 VAC TRIAC dimmable light bulb replacement
  • Output Current: 325 mA
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 105 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS92010EVM-592

TPS92010EVM-592 Specifications

TPS92010EVM-592 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS92010

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 130 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 325 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 105 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is LED Lighting Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top