TPS7B8250EVM

Mfr. #: TPS7B8250EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS7B8250EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS7B8250EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B8250EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 3 V to 40 V Input Voltage Output Voltage is 5 V Output current: 300 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7B8250EVM Image

TPS7B8250EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B8250EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B82-Q1
  • Input Voltage: 3 V to 40 V
  • Output Voltage: 5 V
  • Output Current: 300 mA
  • Series: TPS7B82-Q1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7B8250EVM

TPS7B8250EVM Specifications

TPS7B8250EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3 V to 40 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 300 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

18 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top