TPS61282EVM-586

Mfr. #: TPS61282EVM-586
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS61282EVM-586
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS61282EVM-586 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61282EVM-586 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.3 V to 4.8 V Input Voltage Output Voltage is 3.15 V to 3.5 V Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS61282EVM-586 Image

TPS61282EVM-586

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61282EVM-586 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS61282
  • Input Voltage: 2.3 V to 4.8 V
  • Output Voltage: 3.15 V to 3.5 V
  • Packaging: Bulk
  • Description/Function: Boost converter with pass-through mode evaluation module
  • Series: TPS61282
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61282EVM-586

TPS61282EVM-586 Specifications

TPS61282EVM-586 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.3 V to 4.8 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3.15 V to 3.5 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top