TPS561201EVM-896

Mfr. #: TPS561201EVM-896
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS561201EVM-896
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS561201EVM-896 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS561201EVM-896 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.05 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

TPS561201EVM-896 Image

TPS561201EVM-896

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS561201EVM-896 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS561201
  • Input Voltage: 4.5 V to 17 V
  • Output Voltage: 1.05 V
  • Description/Function: Evaluates the TPS561201 synchronous buck converter
  • Output Current: 2 A
  • Series: TPS561201
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT

TPS561201EVM-896

TPS561201EVM-896 Specifications

TPS561201EVM-896 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4.5 V to 17 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.05 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 2 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed SWIFT

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top