| Mfr. #: | TPS43060EVM-199 |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools TPS43060 EVAL MOD |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TPS43060EVM-199 डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 24 V Input Voltage Output Voltage is 40 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS43060. The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS43060EVM-199 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Switching Controllers.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 24 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 40 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 3 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed TPS43060
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 150 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.