TPS40428EVM-594

Mfr. #: TPS40428EVM-594
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS40428EVM-594
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS40428EVM-594 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40428EVM-594 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 7 V to 14 V Input Voltage Output Voltage is 1.2 V, 1.8 V Output current: 20 A Texas Instruments is a trusted brand for quality electronics Interface Type: PMBus Compatible with TPS40428. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.267032 oz of Unit Weight

TPS40428EVM-594 Image

TPS40428EVM-594

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40428EVM-594 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS40428
  • Input Voltage: 7 V to 14 V
  • Output Voltage: 1.2 V, 1.8 V
  • Description/Function: TPS40428 evaluation module dual output with PMBus interface
  • Output Current: 20 A
  • Series: TPS40428
  • Brand: Texas Instruments
  • Interface Type: PMBus
  • For Use With: TPS40428
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.267032 oz

TPS40428EVM-594

TPS40428EVM-594 Specifications

TPS40428EVM-594 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 7 V to 14 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V, 1.8 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 20 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is PMBus.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TPS40428.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.267032 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top