TPS40090EVM-001

Mfr. #: TPS40090EVM-001
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS40090-001 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS40090EVM-001 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40090EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS40090EVM-001 Image

TPS40090EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40090EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS40090
  • Input Voltage: 12 V
  • Output Voltage: 1.5 V
  • Series: TPS40090
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS40090EVM-001

TPS40090EVM-001 Specifications

TPS40090EVM-001 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top